ValGold Resources Ltd. is pleased to announce additional drilling results from six holes, Seven and Eight The 2009 program of diamond drilling on the son 100% owned Garrison Gold Property. Northern Gold Mining Inc. is the operator of the exploration program and is in first year option agreement with A under which it earns interest in the property gold Garrison ValGold.
Eleven holes of diamond drilling totaling 2333 meters were completed in 2009 Vasant lead to a resource calculation on the Garrcon area. To date, the Garrcon tree zones were drilled at intervals of 30 m over a lateral distance of 195 meters (640 feet). It is possible that areas susceptible to extend a lateral distance of approximately 500 m (1600 feet), as indicated by previous forage and Development underground Cominco in the 1930s. Areas Garrcon Were Also tested with success in depths beyond 200 m in C-06-07 (see news release dated ValGold November 22, 2006) which intersected 3.48 g / t Au over 13.5 m at a depth of 275.5-289.0 m.
Drill holes, GAR-09-06 and -07, tester were the areas of tree and the South-Eastern Tree Garrcon. GAR-09-08 has been designed to test the northern areas.
GAR-09-06 drilled Summer Pass south and 195 meters (640 feet) east of Garrcon tree. Several occurrences of visible gold were noted in areas of the tree.
GAR-09-07 drilled Summer south 25 m below GAR-09-06 to 195 m (640 feet) east of Garrcon tree. Visible gold was noted less than 1.0 meters (3.3 feet) of surface rock where it appears that the forage was implanted into the well of surface area of one. The Shaft A surface area occurs below 3 meters (10 feet) of
overburden and surface Represents a High Priority Target stripping. This feed mine operated intersected on the 73 m (240 ft) level. Mineralization and visible gold was noted by a 6.0 m mining.
GAR-09-08 was located west of 15m and 50m drilled below GAR-09-01 In the northern areas. Results Broad low content were found in northern areas sometimes with specks of visible gold.
Northern Gold indicates he is pleased with the results of 2009 drilling program, and currently developing drill targets for Phase II on the Garrison Gold Property. Because of the potentially low cost of exploration of the time the program will place emphasis on demonstrating a resource perspective Garrcon the car represents the largest value of exploration.
For more information on ValGold and its portfolio of international projects, visit our website at www. Valgold.com.
Review of safety laws Miner after the accident at the coal mine in West Virginia
With the disaster that has left 29 miners dead in West Virginia, in 2006 it again in the coalfields. . . Read more »
Pike River Coal receivers negotiated $63m insurance payout to creditors
PIKE River Coal receivers have negotiated a $ NZ80 million ($ 63. . . Read more »